Nodara

Engineer the market around you.

Vendra understands your suppliers, constraints, dependencies, alternatives and market — then finds the moves that strengthen your purchasing position.

  1. Categories
  2. Aluminium Extrusions
Illustrative workspace

Direct materials · Body structures

Aluminium Extrusions

Reviewed today
Annual spend£18.4m
Qualified suppliers2
Concentration84%one supplier
Contract renewal94 days
Switching lead time7–11 mo

3 opportunities identified

  1. 1
    Reduce single-source dependency

    84% of AL-482 volume sits with one supplier. Neither alternative is qualified.

    Qualification · 6–9 months
    Resilience
  2. 2
    Qualify European alternative

    Two die-casters hold the certification and capacity. One is within 900 km of Sunderland.

    Evidence · 9 sources
    £1.1m–£1.8m
  3. 3
    Reopen price before renewal

    Current unit price sits above the evidence-supported should-cost range.

    Window opens in 38 days
    £0.5m–£0.8m

Every company optimizes procurement by the same principles.
What differs is the board.

Every company plays the same game.
The board is different.

Vendra does not just search for suppliers. It builds a model of the system around every purchasing decision.

  1. SupplierAksan AluminiumQualified · Konya, TR
  2. suppliesMaterialHigh-pressure aluminium castingStructural, body-in-white
  3. specified bySpecificationAL-482±0.05 mm · Rev D
  4. used atPlantSunderland PlantLine 2 · 41 000 parts / wk
  5. governed byContractC-1842Renews in 94 days
  6. £7.2m annual spendSpend£7.2m · 84% dependencyOf AL-482 volume
  7. could supplyAlternative supplierKarlsen CastingListed · not qualified
  8. could supplyAlternative supplierBrenner DruckgussListed · not qualified
  9. requiresQualification6–9 months to qualifyPPAP · trial tooling · line audit
  10. buffersInventory11 days of coverAt Sunderland, AL-482
  11. shapes price ofMarketCasting capacity looseningExpected before renewal

And the market that moves it. Inventory cover and market structure decide how much of that position you can actually use.

See what changes your position.

Vendra reasons across spend, specification, supplier and market. It surfaces what matters, why, and how sure it is.

  1. Position
  2. AL-482
  3. Findings
Illustrative workspace

Specification AL-482 · High-pressure aluminium casting

4 findings that change your position

Ranked by commercial effect
Dependency riskFact

84% of this specification is sourced from one supplier.

Two alternatives exist, but neither is currently qualified.

  • Karlsen CastingNot qualified
  • Brenner DruckgussNot qualified
Next Begin qualification of one alternative
Pricing opportunityInference

Current price is above the should-cost range.

Evidence-supported should-cost sits below the price you pay today.

Annual impact £1.1m–£1.8m category-wide
Specification constraintInference

One tolerance requirement removes about 70% of viable suppliers.

Tolerance is the narrowest constraint in the specification.

Next Engineering review recommended
Negotiation timingHypothesis

Supplier capacity is expected to loosen ahead of renewal.

Capacity signals point to loosening before the contract renews.

Window January–February

Illustrative product data. Figures are examples, not customer results.

From signal to action.

Watch one renewal become a decision, an execution and a measured result.

  1. Contract renewal approaching

    A renewal 94 days out is the signal. Nobody has to ask.

  2. Vendra reconstructs the position

    Suppliers, specifications, contracts, plants and spend, assembled from your own records.

  3. It analyses supplier dependency

    How much volume rests on one supplier, and for how long that can last.

  4. It searches internal and external evidence

    Contracts and purchase orders alongside registries, filings and trade data.

  5. It discovers alternative suppliers

    Not a list. Candidates ranked on capability, certification, capacity and logistics.

  6. It checks qualification constraints

    What each alternative would actually take to reach production.

  7. It builds the should-cost model

    What the part should cost, from evidence, before anyone asks for a quote.

  8. It models BATNAs and leverage

    Where each side stands, and the range in which a deal is possible.

  9. It recommends a sourcing strategy

    A reasoned move with its evidence attached, not a ranked supplier list.

  10. The buyer reviews

    People decide what matters. Vendra shows its work.

  11. Approved RFQs are issued

    Authorised once, within policy, on the record.

  12. Supplier responses are compared

    Price, lead time and risk side by side, against the model.

  13. The commercial outcome is measured

    Results return to the model, so the next decision starts better informed.

  1. Renewals
  2. Contract C-1842
Illustrative workspace

Run · AL-482 renewal

The commercial outcome is measured
13 / 13

Outcome · measured

Unit price£4.82 → £4.58
Dependency84% → 60%
Position strengthenedResult recorded against the recommendation, so the next run starts with what this one learned.

Not a chatbot.
A set of working surfaces.

Each surface answers a different question. All of them draw on the same model of your company.

Every move, ranked by effect.

A live feed of commercial opportunities, dependency risks and sourcing actions, ordered by what they would change.

  1. Position
  2. Opportunities
Illustrative workspace

Opportunity pipeline

12 opportunities, ranked by effect

  • All 12
  • Dependency 4
  • Pricing 5
  • Timing 3
  1. 1
    Qualify second source for AL-482Dependency · Owner Sarah Chen
    £1.1m–£1.8m
    92

    Grounded in 41 sources. Qualification begins 6–9 months before the renewal window closes, so the decision is time-bound.

  2. 2
    Reopen price before C-1842 renewalPricing · Owner Sarah Chen
    £0.5m–£0.8m
    81
  3. 3
    Review ±0.05 mm tolerance on AL-482 Rev DSpecification · Owner Tom Okafor
    Unlocks 2 suppliers
    74
  4. 4
    Consolidate extrusion volumes across two plantsSpend · Owner Priya Nair
    £0.3m–£0.5m
    69
  5. 5
    Pre-position inventory ahead of capacity shiftTiming · Owner Tom Okafor
    Risk reduction
    58

The shape of a category, at a glance.

Spend structure, market structure, supplier concentration, constraints and strategy, in one view.

  1. Categories
  2. Aluminium Extrusions
  3. Intelligence
Illustrative workspace
Spend£18.4m
Market concentrationConcentratedHHI 3 900 · high
StrategyDual-source

Spend structure

  • AL-482 · structural casting
    £7.2m
  • AL-310 · extruded rail
    £5.1m
  • AL-227 · crash box
    £3.4m
  • Other specifications
    £2.7m

Market structure

Regional capacity is tightening for the next two quarters, then loosening.

Constraints

  • IATF 16949 requiredHard
  • ±0.05 mm toleranceNarrow
  • PPAP before volume6–9 mo
  • Customer approval on source changeRequired

Know a supplier before you ask for a quote.

Capabilities, certifications, locations and risks, each with its evidence and its qualification status.

  1. Suppliers
  2. Karlsen Casting
Illustrative workspace

Supplier · Stavanger, Norway

Karlsen Casting

Alternative · RFQ-eligible
  1. Desk review
  2. Site audit
  3. Trial parts
  4. PPAP
  5. Approved

Capabilities

  • High-pressure die casting
  • T6 heat treatment
  • CNC machining
  • 18 000 parts / wk

Certifications

  • IATF 16949
  • ISO 14001
  • ISO 45001

Evidence

  • Holds IATF 16949 for pressure die castingRegistry · retrieved 12 Sep
  • Can hold ±0.05 mm on comparable partsQuality records · 2 customers
  • Spare capacity from Q1Trade data · low confidence

Risks

Logistics lead time +6 days to Sunderland. Single plant for this process.

Requirements, responses and decisions together.

RFQs, supplier comparison, approvals and the decision record, as one traceable piece of work.

  1. Sourcing
  2. RFQ-1842
Illustrative workspace

RFQ-1842 · AL-482 · closes 28 Nov

Supplier comparison

4 of 4 responded

Requirements

  • IATF 16949All
  • ±0.05 mm3 of 4
  • Capacity ≥ 15 000 / wk3 of 4
  • Incoterms DAPAll

Approvals

  1. Category lead · S. Chen
  2. Finance · M. Ruiz
  3. Engineering · T. Okafor

Responses

SupplierUnitTo productionFit
Karlsen Casting£4.527 moStrong
Brenner Druckguss£4.589 moStrong
Tiverton Light Alloys£4.6913 moPartial
Aksan Aluminium£4.71NowStrong

Decision record opens when approvals complete: assumptions, alternatives considered, evidence used.

Walk in knowing where the leverage is.

Your position, theirs, the BATNAs, the zone of agreement, anchors and scenarios, prepared before the meeting.

  1. Negotiations
  2. Aksan Aluminium
  3. Preparation
Illustrative workspace

Negotiation preparation · window Jan–Feb

Aksan Aluminium · C-1842

Leverage improving

Your position

  • BATNA£4.58 landed · Karlsen
  • Dependency84%
  • Switching time7–11 mo

Supplier position

  • BATNASpot sales · £4.40
  • Volume share12% of plant
  • CapacityLoosening
ScenarioUnit priceAnnual effect
Stretch£4.38£0.66m
Target£4.50£0.48m
Walk-away£4.70£0.18m

Your procurement organisation should not forget what it learns.

Decisions, negotiations, research, contract outcomes and the evidence behind them stay connected, long after the people involved have moved on.

  1. Memory
  2. AL-482
Illustrative workspace
Why did we choose Aksan for AL-482 in 2024?Reconstructed from 11 records
  1. 2022Category researchExtrusion market mapped; 14 suppliers screened
  2. 2023RFQ-1291Four responses compared on price and capability
  3. 2024Award · AL-482Awarded to Aksan Aluminium under C-1842
  4. 2025Price reviewIndex-linked adjustment agreed
  5. 2026Renewal preparationPosition reconstructed 94 days out
Decision
Award AL-482 to Aksan Aluminium on a three-year contract, single-sourced.
Alternatives considered
Brenner Druckguss failed the ±0.05 mm trial. Karlsen Casting lacked capacity at the time (11 000 / wk).
Commercial assumptions
Metal indexed to the LME, conversion fee held. Volume growth of 4% a year.
Qualification constraints
PPAP took 8 months. Tooling is owned by the supplier.
Evidence used
RFQ-1291 responses · January 2024 site audit · trial-part report · 3 quality records.
Outcome so far
Price held through 2025. Dependency reached 84%. Karlsen has since expanded capacity to 18 000 / wk.

Institutional intelligence, not chat history. Illustrative workspace.

Every recommendation can be interrogated.

Vendra separates fact, inference and hypothesis, and keeps the evidence for each.

  1. Suppliers
  2. Aksan Aluminium
  3. Claim 03
Illustrative workspace

Recommendation

Qualify Karlsen Casting as a second source for AL-482.

Rests on 4 claims · 2 facts · 1 inference · 1 hypothesis

Claims

  1. Fact

    Aksan Aluminium supplies 84% of AL-482 volume.

  2. Inference

    Karlsen Casting can hold ±0.05 mm on comparable parts.

  3. Fact

    IATF 16949 certification currently covers aluminium pressure die casting for automotive components.

  4. Hypothesis

    Karlsen Casting will have spare capacity from Q1.

Evidence · Claim 03

“Scope of certification: manufacture of aluminium pressure die-cast and machined parts for the automotive industry.”
Source
IATF certificate registry
Evidence type
Third-party registry
Retrieved
2 Oct 2026
Confidence
High · directly evidenced
Retained artifact
ART-0417 · SHA 91AF…C20B

Read the evidence. The source, the archived excerpt, when it was retrieved and a hash of the retained artifact.

Intelligence that can act.
Control that stays with you.

Vendra can work inside your systems without becoming an uncontrolled agent. Every consequential action passes through the same gates, in the same order.

  1. Sourcing
  2. RFQ-1842
  3. Proposed action
Illustrative workspace
  1. 1

    Recommendation

    Send RFQ to 4 pre-qualified suppliersBacked by 41 sources and 3 graded findings
    Proposed
  2. 2

    Policy check

    External communicationBuyer approval required · 4 recipients · RFQ-1842
    Within policy
  3. 3

    Buyer approval

    Approved by Sarah ChenCategory lead · 14:31
    Approved
  4. 4

    Permission check

    Scoped to RFQ-1842Send only · supplier contacts · no attachments beyond the RFQ pack
    Permitted
  5. 5

    Execution

    Authorized onceExecuted 14:32 · 4 sent
    Done
  6. 6

    Audit event

    #27Action, approver, policy version, evidence and time, retained
    Recorded
  • Vendra proposes. Always with its evidence.
  • Policy decides what needs a person.
  • People approve what matters.
  • Every step stays on the record.

Keep the systems you already use.

Vendra sits above your stack. It reads from the systems that hold your procurement reality, and acts through them where you permit it.

Your systems

  • ERP
  • SRM
  • Procurement suites
  • Contract repositories
  • Finance systems
  • Supplier portals
  • Email
  • Documents
  • Operational systems
  • External market data
VendraProcurement intelligence and execution layer
  • Understands the board
  • Finds the move
  • Executes under control

Back into them · approved only

  • RFQs and supplier messages
  • Requisitions and orders
  • Contract tasks and notes
  • Decision records

Wherever there is permitted programmatic access

  • APIs
  • Connectors
  • Webhooks
  • Exports
  • Programmatic access

Today, and where it is heading.

Available today

  • Requisition intelligence: deciding whether a request should become a sourcing effort
  • Evidence-led supplier discovery, qualification and comparison
  • RFQ workflows, with approvals and an audit trail
  • Connectors for SAP S/4HANA, SAP Ariba and Coupa

Direction, not yet available

  • The wider position, leverage and negotiation views shown on this page
  • Outcome measurement that feeds back into each recommendation

Screens on this page use illustrative data. They show where the product is going, not customer results.

Vendra works with your current suppliers and sourcing channels. Its aim is to give you more informed options, not to replace the relationships that already work.

What if leverage had been engineered before the negotiation began?

The Ford × Novelis story: supplier concentration, qualification lead time, specifications and switching constraints can decide who holds the power long before anyone sits at the table.

See the Vendra analysis
  1. 1Supplier concentration
  2. 2Qualification lead time
  3. 3Specifications
  4. 4Switching constraints

Know where you stand. See the next move.

  1. Position
Illustrative workspace

Your position

  • £82.6mmonitored spend
  • 12opportunities
  • 4critical dependencies
  • 27alternatives being evaluated
  • 6negotiations approaching

Highest-value move

Qualify second source for AL-482 before Q2 renewal.

Estimated commercial impact
£1.1m–£1.8m
Strategic effect
Single-source → dual-source
Execution readiness
Qualification required

Dependency

Illustrative product data. Figures are examples, not customer results.

Find the moves that strengthen your position.

Connect Vendra to your procurement environment and build a continuously improving model of your market, constraints and options.

Vendra is opening to a small group of companies first. Every renewal you negotiate without the board is a move you didn’t see.